Library Feasibility Study

Share Library Feasibility Study on Facebook Share Library Feasibility Study on Twitter Share Library Feasibility Study on Linkedin Email Library Feasibility Study link

Consultation has concluded

A person walks up to the entrance of the Longmont Public Library in the summertime.

Tell us what you want YOUR library to be!

The Longmont area has grown quite a lot since the current library building was completed in 1993, and technology has changed the way people gather information for research, entertainment, and community connection. In December 2019, the City of Longmont began a feasibility study to contemplate the future of the Longmont Public Library. Specifically, the study is intended to discover what the Longmont community most wants and needs from its library and how those goals can best be achieved with potential funding structures. The outcome of this study will likely affect the Library (and therefore, the community) for decades to come.

Thanks for completing the survey!
Between January 17 and February 17, more than 1,400 people took the survey to determine what our community needs from its library moving forward. Results of the survey are being analyzed by the consulting team hired to complete the feasibility study. Those results will be reflected in the final feasibility study report. Thank you to everyone to took the time to complete the survey.

Thanks for attending the community meetings!
In order to compile as much information as possible from as many residents as possible, the Library hosted five community meetings around town to hear directly from members of the public about what they believe the Longmont Public Library should offer. If you took time to attend one of the meetings, thank you! Your voices were heard and your comments and suggestions will be incorporated into the final report.



Tell us what you want YOUR library to be!

The Longmont area has grown quite a lot since the current library building was completed in 1993, and technology has changed the way people gather information for research, entertainment, and community connection. In December 2019, the City of Longmont began a feasibility study to contemplate the future of the Longmont Public Library. Specifically, the study is intended to discover what the Longmont community most wants and needs from its library and how those goals can best be achieved with potential funding structures. The outcome of this study will likely affect the Library (and therefore, the community) for decades to come.

Thanks for completing the survey!
Between January 17 and February 17, more than 1,400 people took the survey to determine what our community needs from its library moving forward. Results of the survey are being analyzed by the consulting team hired to complete the feasibility study. Those results will be reflected in the final feasibility study report. Thank you to everyone to took the time to complete the survey.

Thanks for attending the community meetings!
In order to compile as much information as possible from as many residents as possible, the Library hosted five community meetings around town to hear directly from members of the public about what they believe the Longmont Public Library should offer. If you took time to attend one of the meetings, thank you! Your voices were heard and your comments and suggestions will be incorporated into the final report.



  • Share Do you have ideas for how to improve our library? on Facebook Share Do you have ideas for how to improve our library? on Twitter Share Do you have ideas for how to improve our library? on Linkedin Email Do you have ideas for how to improve our library? link

    We would love to hear your suggestions for how we can make your Library even better! Please leave your ideas below. 

    To add your idea
    Sign In / Register
    Start by submitting an idea